- This event has passed.
F2F component for ‘Battery Storage Systems’ Install Only
3 February, 2021 – 5 February, 2021

The Battery Storage Systems for Grid-Connected PV Systems Install Only course consists of two main components: online theory completed at students’ own pace and the face-to-face (3 days) component held at NECA Training, 122 Hume Highway, Chullora NSW 2190. Students can only book their place at the face-to-face component after completing 60% of the online assessment (indicative 30-40 hours).