Loading Events

« All Events

F2F component for ‘Battery Storage Systems’ Design & Install

19 January 21 January

The Battery Storage Systems for Grid-Connected PV Systems Design & Install course consists of two main components: online theory completed at students’ own pace and the face-to-face (3 days) component held at NECA Training, 122 Hume Highway, Chullora NSW 2190. Students can only book their place at the face-to-face component after completing 60% of the online assessment (indicative 40-60 hours).

Details

Start:
19 January
End:
21 January
Event Category:
Website:
https://www.gses.com.au/product/gcwb/

NECA Training, 122 Hume Highway, Chullora, NSW 2190

122 Hume Highway
Chullora, NSW 2190 Australia
+ Google Map
Cart Preview

Your cart is currently empty.

Return to shop