All Day

F2F component for ‘Battery Storage Systems’ Install Only

NECA Training, 122 Hume Highway, Chullora, NSW 2190 122 Hume Highway, Chullora

The Battery Storage Systems for Grid-Connected PV Systems Install Only course consists of two main components: online theory completed at students’ own pace and the face-to-face (3 days) component held at NECA […]

F2F component for ‘Battery Storage Systems’ Design & Install

NECA Training, 122 Hume Highway, Chullora, NSW 2190 122 Hume Highway, Chullora

The Battery Storage Systems for Grid-Connected PV Systems Design & Install course consists of two main components: online theory completed at students’ own pace and the face-to-face (3 days) component held at […]

Cart Preview

Your cart is currently empty.

Return to shop